Sunday, March 10, 2013

The Cost of inadequate Interoperability

An infographic including a study by The US National Institute of Standards and Technology (NIST) showing that poor handover of data and documentation from a construction project can result in 66% of the total cost of rework, errors and downtime are incurred in the operations phase of a facility or asset. Estimates show this to be an annual cost to US industry in excess of $15.8Bm.

Source - http://www.mclarensoftware.com/resources/infographics/infographic-the-cost-of-inadequate-interoperability-.aspx

Inadequate Data Interoperability